each "unmovable" pipe/conduit etc that will end up penetrating a slab is already carefully verified before the next step is taken (such as placing concrete)
My experience is as an architect.
The CAD file isn’t the building no matter how much everyone might wish it were.
Even if the plans were the building odds of everybody using the same plan revision all the time is just about zero.
And most of the time, nobody is gonna pay for a super accurate as-built BIM. Because the point of the exercise is a certificate of occupancy.
My experience is as an architect.
The CAD file isn’t the building no matter how much everyone might wish it were.
Even if the plans were the building odds of everybody using the same plan revision all the time is just about zero.
And most of the time, nobody is gonna pay for a super accurate as-built BIM. Because the point of the exercise is a certificate of occupancy.